GPR and pit-to-pipe tracing to locate and map concrete, clay and PVC drainage networks across Melbourne and Victoria. Discuss exposure and survey requirements against your design brief and asset-owner conditions.
Before any works near a drainage easement, you need to know where the pits and pipes actually are. Existing council plans are often incomplete or inaccurate, particularly for older concrete or clay drain systems that predate digital asset management.
HR Utilities locates and maps the physical position of stormwater drainage assets — their horizontal alignment, depth, pipe material, and pit locations — producing georeferenced data for engineering design, planning applications, and authority consent.
This service is about establishing where the drainage network is. If you need to assess the condition of a drain — blockages, cracks, or root intrusion — see our CCTV drain inspections and blocked drain CCTV investigation services.
If the design or asset owner requires physical confirmation, discuss targeted vacuum excavation and utility surveying with the team. Agree the quality level, datum and any required certification before booking.
Electromagnetic induction (EML) — the standard method for tracing metallic pipes and cables — cannot detect concrete, clay, or PVC drainage. A different toolkit is required.
Concrete, vitrified clay and PVC do not conduct an electromagnetic locating signal. GPR or an accessible sonde may help investigate the pipe route, depending on ground response and access. Record detection limits and unresolved sections.
Confirm the asset type, proposed installation method and current project conditions with Melbourne Water before selecting the investigation scope.
Obtain the relevant council's conditions for your project. Agree any required exposure, survey and consent documentation before fieldwork.
Agree the quality level required for each project decision. Record the investigation method, survey evidence and unresolved areas; confirm any certification requirement separately.
With suitable, authorised access, a sonde may help trace an alignment and dye testing may help investigate connectivity or flow between accessible points. Neither method guarantees a complete network route; record coverage and unresolved connections.
Discuss DWG/DXF plans, GIS data and measured level tables with the team. Agree the file formats and datum needed by your receiving designer.
For full utility mapping combining drainage with other services, see our subsurface utility mapping and utility surveying services.
A four-stage process from desktop records through to survey-grade deliverables — scaled to what your project and authority require.
We gather existing drainage plans, council records, and BYDA information to map what is known before fieldwork begins. This establishes the network baseline and identifies gaps.
Technicians use GPR and accessible pit-to-pipe tracing where conditions permit. Sonde tracing may help investigate alignment; dye testing may help check connectivity or flow. Confirm suitable access and asset-owner conditions, and record any unresolved sections.
Agree any targeted exposure and survey with the team against the design needs and asset-owner conditions. Confirm access, work controls, datum and any required certification before fieldwork.
Agree the CAD or GIS output, datum and required quality levels before booking. Record measured, detected and inferred features with investigation limits. The receiving designer or authority must confirm that the evidence meets the intended use.
Melbourne Water's utility installation guidance distinguishes installation methods and asset types. Confirm the conditions for your proposed works with Melbourne Water; a generic distance or locating result does not establish consent.
For a council drain, obtain the relevant council's requirements for the site. Send the asset-owner response, proposed works drawings and required survey outputs to the team so they can confirm the investigation scope.
Discuss locating, targeted exposure and feature and level survey as separate scope items. Confirm any required surveyor credentials and certification before fieldwork. Vacuum excavation still carries risks: follow the asset owner's instructions and site controls when exposing a drain.
Concrete, clay and PVC pipes do not conduct an electromagnetic locating signal. Locators may use GPR, accessible pit-to-pipe tracing or a sonde where access and asset-owner conditions permit. Ground conditions and access affect detection. Discuss targeted physical exposure and survey requirements if the project needs a confirmed pipe position or depth.
No. Drainage asset locating shows where pits and pipes are. That means their horizontal position, depth, and network layout. Engineers and designers know what is in the ground before they build near it. CCTV inspection looks inside a pipe at its internal condition: cracks, root intrusion, sediment, joint displacement. The two services are complementary. If you need to know where the drain is, you need locating. If you need to know what condition it is in, you need CCTV. See our CCTV inspections and blocked drain CCTV investigation pages for condition assessment services.
Obtain Melbourne Water's conditions for your proposed works before commissioning fieldwork. Its utility installation guidance distinguishes asset types and installation methods. Send the conditions, drawings and required outputs to HR Utilities so the team can confirm the locating, exposure and survey scope. Confirm any required surveyor credentials or certification before booking; locating does not grant authority consent.
Ask the relevant council or asset owner for the conditions applying to your site and proposed works. Requirements for exposure, survey, access and consent vary by asset and project. Send those conditions with your drawings so HR Utilities can confirm the investigation scope and any additional professional involvement before booking.
Agree the deliverables before booking. These may include CAD plans, GIS data and a report recording located pits, pipe alignments, measured levels and investigation limits. Specify the required datum, file format and quality level. Confirm any authority-required certification as a separate scope item; physical exposure alone does not establish surveyor credentials or approval.
Expert utility locating services with BYDA certified precision.
Serving projects across Australia with advanced subsurface mapping solutions.